02How it works

From first question to a stable foundation.

Foundation restoration is a journey of months, with clear decision points. Here you can see the phases it usually involves, what you notice in each, and what the planning depends on.

Illustrative image

Seven phases, each with a clear purpose

Not every project goes through every phase in equal depth. We deliberately don't state durations as fixed: they depend on investigation, permits, neighbours and buildability.

  1. 1

    Phase 01

    Intake and first assessment

    We discuss your question, review photos and any reports, and assess whether further investigation is warranted.

    What you notice
    A conversation and possibly a visit to the property.
    Depends on
    Availability of existing reports and drawings.
  2. 2

    Phase 02

    Investigation

    Inspection pits, timber samples, settlement monitoring and, where needed, cone penetration tests reveal the state of foundation and soil.

    What you notice
    Digging at the façade or in the crawl space, usually brief.
    Depends on
    Access, season, scheduling of survey firms.
  3. 3

    Phase 03

    Structural design

    A structural engineer develops a restoration method: pile plan, beams, phasing and temporary support.

    What you notice
    Discussion of choices and a substantiated quote.
    Depends on
    Complexity, neighbouring buildings, additional investigation.
  4. 4

    Phase 04

    Permits and logistics

    Environmental permit where required, arrangements for public space, neighbours, storage and deliveries.

    What you notice
    Signing applications and coordinating with neighbours or owners' association.
    Depends on
    Municipal procedures and location — not precisely predictable in advance.
  5. 5

    Phase 05

    Temporary support and preparation

    Floors and services are removed where needed, and the building is supported before foundation work begins.

    What you notice
    Limited access to the ground floor; sometimes temporary relocation.
    Depends on
    Construction method, layout and use of the building.
  6. 6

    Phase 06

    Construction

    Piles are installed, reinforcement placed, formwork set and concrete poured — phased according to the design.

    What you notice
    Noise and site traffic within agreed working hours.
    Depends on
    Soil, access, weather and material deliveries.
  7. 7

    Phase 07

    Curing, checks and handover

    Concrete must cure before loads are transferred. After checks, the support is removed and the work handed over.

    What you notice
    A handover meeting and documentation of the work carried out.
    Depends on
    Concrete type, temperature and the checks in the design.

Why we don't promise a fixed timeline

An honest schedule only emerges after investigation and design. Until then, we only indicate the phases.

  • 01Outcome of the foundation investigation
  • 02Permit procedures and public space
  • 03Coordination with neighbours and owners' association
  • 04Access for equipment
  • 05Weather conditions and curing
Illustrative image

For the occupant

What you can expect along the way

One point of contact

You know whom to call about planning, disruption or questions about the work.

Clear decision points

After investigation and after design, you decide with the information on the table.

Agreements with neighbours

In terraced blocks we coordinate early; a joint approach is often sensible.

Documentation

You keep reports, drawings and handover records — also important when selling.

Conceptual illustration

Safely repairing a load-bearing columnClose-up of a damaged concrete column with props, exposed reinforcement, added reinforcement, formwork, pour and a concrete jacket.

Stage 6 of 6ReloadingAfter approval the props are removed in phases and the column carries load again.

Existing structureDamage / settlementNew structureTemporary supportLoad path

Column repair

Safely repairing a load-bearing column

With damaged concrete columns, safety comes before speed: support first, then repair, and only reload in a controlled way after curing.

Illustrative. Whether a column is repaired, jacketed or replaced, and how long curing takes, follows from the design and specifications.

Investigation & rules

Inspections, engineering and permits

Foundation restoration affects the structural safety of your building and often that of neighbours. That is why investigation and calculations always come first.

Uncertainty is part of foundation work: what lies below ground sometimes only becomes clear during the work. A good quote names these risks and how they are handled.

Foundation investigation
Determines the condition of piles and masonry and the urgency of repair. Carried out by a specialised survey firm.
Structural calculation
A structural engineer determines pile type, depth, beam dimensions, reinforcement and the sequence of temporary support.
Permit requirements
Whether an environmental permit or notification is required depends on the work and building. This is agreed with the municipality per situation.
Supervision during execution
Reinforcement checks before pouring and measurements during the work ensure execution follows the design.

Lead times vary per project and depend on investigation, permits and scheduling, among other things. We discuss the expected planning in the quotation.