Foundation restoration that starts with understanding.

From first inspection to a stabilised foundation: we restore based on investigation and a structural design — never from a standard package.

Illustrative image

Every foundation tells a different story

Many Amsterdam buildings stand on timber piles in peat and clay, with groundwater as the main protector of that timber. When groundwater drops, loads change or the timber is attacked by bacteria, a building can settle unevenly. Which intervention makes sense differs per building and per façade. Below you can read what work we carry out and when it typically applies.

01 · Always the first step

Foundation inspection and preliminary investigation

The basis for every decision: knowing what happens beneath the building.

  • Visual survey of cracks, tilt and frames
  • Coordinating inspection pits, timber samples and settlement monitoring with specialist firms
  • Archive research into building drawings and earlier foundation reports
  • Clear feedback: what we know, and what we don't yet
02 · With severely degraded or undersized timber piles

Pile and foundation beam replacement

New piles down to the bearing sand layer with a new concrete beam.

  • Low-vibration pile systems suited to neighbouring buildings
  • New reinforced concrete beam under the masonry
  • Phased execution with temporary support
  • Following the structural engineer's design
03 · With spalling, cracking or corroding reinforcement

Column, beam and reinforcement repair

Targeted repair of concrete damage to columns and beams in basements or crawl spaces.

  • Removing loose and degraded concrete
  • Cleaning, treating or supplementing reinforcement
  • New concrete jacket or repair mortar
  • Element by element, supported where needed
04 · With limited space or local settlement

Underpinning with steel tube piles

Transferring loads to new piles beside or beneath the existing foundation.

  • Compact equipment, suitable for indoor spaces
  • Steel or concrete needle beams for load transfer
  • Possible per façade or part of a building
  • Suitability depends on calculation and soil
05 · Only if the timber deeper down is demonstrably sound

Pile head lowering

Replacing the dried-out top section of piles so healthy timber is under water again.

  • Requires timber quality investigation
  • New extension in concrete or masonry
  • Smaller intervention than full replacement
  • Not suitable when bacterial decay spans the full length

Comparing methods

Which approach suits which situation?

A simplified overview to prepare the conversation with the structural engineer. The final choice always follows from investigation and calculation.

MethodOften suitsIntrusivenessDecisive factors
Full replacementWidely degraded timber pilesHighSoil profile, neighbours, access
UnderpinningLocal settlement, limited spaceMediumBearing capacity, transfer structure
Pile head loweringDry timber, sound deeper downMediumTimber quality, groundwater level
Column and beam repairConcrete damage, rebar corrosionLow to mediumExtent of damage, support

Intrusiveness is a general impression, not a prediction for your building. Combinations are common.

Engineering-led

How we arrive at the right method

  1. 1

    Facts first

    Measurements, inspection pits and timber research come before any price or method.

  2. 2

    Designed by an engineer

    Pile plan, beam calculation and phasing come from a structural engineer and form the basis for execution.

  3. 3

    Buildable in the city

    We test the design against narrow streets, quays, neighbours and the space around the building.

  4. 4

    Checks per phase

    Support, reinforcement and concrete work are checked per phase before we proceed.

Recognise

What foundation damage looks like

Foundation problems usually develop slowly. A single sign says little; a combination, or signs that get worse, is reason for investigation.

  • 01

    Stepped cracks

    Cracks that follow the mortar joints, often diagonally from window and door corners. Cracks that widen matter more than hairline cracks in plaster.

  • 02

    Sticking windows and doors

    Frames going out of square or doors that suddenly rub can indicate uneven settlement — but also damp or timber movement.

  • 03

    Leaning walls and sloping floors

    A facade visibly leaning forward or sideways, or floors where a marble rolls away. A measurement turns a feeling into a fact.

  • 04

    Damaged columns and beams

    Cracks, spalled concrete or rust stains on columns in a basement or crawl space. Exposed reinforcement calls for prompt assessment.

  • 05

    Separating joints

    Gaps between facade and neighbouring building, between floor and skirting or at extensions can indicate differential settlement.

  • 06

    Damp and low groundwater

    A dry crawl space that used to be wet can mean timber pile heads are now above the groundwater.

Amsterdam

Logistics in a historic city

Narrow streets, canals and closely built houses make execution in Amsterdam distinctive. Good preparation prevents delay and disruption.

  • 01

    Access and storage

    Equipment and materials often need to be delivered in small quantities. Storage space on the street is limited.

  • 02

    Parking and closures

    Site set-up, skips or temporary closures may require municipal permission. Costs and conditions are set by the municipality.

  • 03

    Working from inside

    Where there is no space outside, work is sometimes done from inside with compact, low-vibration equipment. That requires cleared rooms.

  • 04

    Neighbours and block approach

    Buildings often share foundations. Restoring per block can have structural and logistical benefits, but requires coordination.

  • 05

    Living in during works

    Whether you can stay depends on the method. When working from inside, temporary housing is often needed.

  • 06

    Monuments and protected areas

    Additional requirements apply to listed buildings. Coordination with the municipality is then especially important.

The information on this page is general in nature and not structural or legal advice. Suitable advice can only be given after investigating your specific situation.

Conceptual illustration

Foundation for a home extensionSection of an Amsterdam house on timber piles with a new rear extension on its own piles and grade beam, separated by a movement joint.

Stage 7 of 7New load pathThe extension carries its load through beam and piles to the sand layer; the existing house keeps its own load path.

Existing structureNew structureLoad path

Home extension

Foundation for a home extension

An extension adds new load to the ground. Whether it is carried by its own foundation, a connection or a combination is decided by the structural engineer, based on soil investigation, the existing foundation and permit requirements.

Simplified illustration, not a design. Foundation type, pile depth and the connection to the existing building follow from the structural design, soil investigation and the permit.